{"id":78237,"date":"2026-03-26T20:48:19","date_gmt":"2026-03-26T20:48:19","guid":{"rendered":"https:\/\/zennihost.com\/test\/2026\/03\/26\/miratohen-2-parqe-fotovoltaike-rama-i-jep-me-koncesion-49-vjet-token-oligarkut-vasil-jovani-2\/"},"modified":"2026-03-26T20:48:19","modified_gmt":"2026-03-26T20:48:19","slug":"miratohen-2-parqe-fotovoltaike-rama-i-jep-me-koncesion-49-vjet-token-oligarkut-vasil-jovani-2","status":"publish","type":"post","link":"https:\/\/zennihost.com\/test\/2026\/03\/26\/miratohen-2-parqe-fotovoltaike-rama-i-jep-me-koncesion-49-vjet-token-oligarkut-vasil-jovani-2\/","title":{"rendered":"Miratohen 2 parqe fotovoltaik\u00eb\/ Rama i jep me koncesion 49 vjet tok\u00ebn oligarkut Vasil Jovani"},"content":{"rendered":"<p>N\u00eb mbledhje t\u00eb sotme, K\u00ebshilli i Ministrave miratoi nd\u00ebrtimin e 2 centraleve p\u00ebr gjenerimin e energjis\u00eb elektrike n\u00eb jug t\u00eb vendit, nj\u00eb n\u00eb Kolonje dhe tjetri n\u00eb Devoll.<\/p>\n<p>Leja e pare i jepet oligarkut Vasil Jovani, pronar i Kronos Konstruksion, ndersa tjetra i jepet pronarit te \u201cTekno Fire\u201d, Alban Cejku, te njohur edhe si \u201cLuma Group\u201d.<\/p>\n<p>V E N D I M<\/p>\n<p>P\u00cbR MIRATIMIN E ND\u00cbRTIMIT T\u00cb CENTRALIT GJENERUES T\u00cb ENERGJIS\u00cb ELEKTRIKE FOTOVOLTAIKE DHE VEPRAVE NDIHM\u00cbSE, I CILI NUK \u00cbSHT\u00cb OBJEKT KONCESIONI, N\u00cb AF\u00cbRSI T\u00cb FSHATIT V\u00cbRNIK, NJ\u00cbSIA ADMINISTRATIVE QEND\u00cbR BILISHT, BASHKIA DEVOLL, QARKU KOR\u00c7\u00cb, NGA SHOQ\u00cbRIA \u201cKRONOS KONSTRUKSION\u201d, SH.P.K.<\/p>\n<p>N\u00eb mb\u00ebshtetje t\u00eb nenit 100 t\u00eb Kushtetut\u00ebs dhe t\u00eb pik\u00ebs 1, t\u00eb nenit 49, t\u00eb\u00a0 ligjit nr.43\/2015, \u201cP\u00ebr sektorin e energjis\u00eb elektrike\u201d, t\u00eb ndryshuar, me propozimin e ministrit t\u00eb Infrastruktur\u00ebs dhe Energjis\u00eb, K\u00ebshilli i Ministrave<\/p>\n<p>V E N D O S I:<\/p>\n<p>Miratimin e nd\u00ebrtimit t\u00eb centralit gjenerues t\u00eb energjis\u00eb elektrike fotovoltaike dhe veprave ndihm\u00ebse, i cili nuk \u00ebsht\u00eb objekt koncesioni dhe nuk p\u00ebrfiton nga masat mb\u00ebshtet\u00ebse, n\u00eb af\u00ebrsi t\u00eb fshatit V\u00ebrnik, nj\u00ebsia administrative Qend\u00ebr Bilisht, Bashkia Devoll, Qarku Kor\u00e7\u00eb, nga shoq\u00ebria \u201cKRONOS KONSTRUKSION\u201d, sh.p.k., me elementet, si m\u00eb posht\u00eb vijon:<br \/>\na) Emri i aplikuesit: shoq\u00ebria \u201cKRONOS KONSTRUKSION\u201d, sh.p.k.;<br \/>\nb) NIPT\/NUIS: K41416033P;<br \/>\nc) Tipi i centralit: fotovoltaik;<\/p>\n<p>\u00e7)\u00a0 Kapaciteti i instaluar: 50M\u00cb;<\/p>\n<p>d) Afati i pritsh\u00ebm i v\u00ebnies n\u00eb pun\u00eb dhe pajisja me leje nd\u00ebrtimi: koha p\u00ebr nd\u00ebrtimin, pajisjen me lejen e nd\u00ebrtimit dhe v\u00ebnien n\u00eb operim t\u00eb impiantit fotovoltaik do t\u00eb jet\u00eb brenda 36 (tridhjet\u00eb e gjasht\u00eb) muajve nga hyrja n\u00eb fuqi e k\u00ebtij vendimi;<br \/>\ndh) Vendndodhja e burimit gjenerues t\u00eb energjis\u00eb: n\u00eb af\u00ebrsi t\u00eb fshatit V\u00ebrnik, nj\u00ebsia administrative Qend\u00ebr Bilisht, Bashkia Devoll, Qarku Kor\u00e7\u00eb;<br \/>\ne) Afati i operimit: 49 (dyzet e n\u00ebnt\u00eb) vjet nga hyrja n\u00eb fuqi e k\u00ebtij vendimi;<\/p>\n<p>\u00eb)\u00a0 Koordinatat e tok\u00ebs dhe planvendosja sipas aneksit 1, q\u00eb i bashk\u00eblidhet k\u00ebtij vendimi;<\/p>\n<p>f) Ministria e Infrastruktur\u00ebs dhe Energjis\u00eb dhe Agjencia Komb\u00ebtare e Burimeve Natyrore kan\u00eb t\u00eb drejt\u00eb t\u00eb ushtrojn\u00eb mbik\u00ebqyrje t\u00eb p\u00ebrgjithshme me afate 3-mujore gjat\u00eb realizimit, v\u00ebnies n\u00eb pun\u00eb dhe operimit, me synim q\u00eb t\u00eb verifikojn\u00eb se ecuria e punimeve, cil\u00ebsia, konformiteti dhe operimi jan\u00eb n\u00eb p\u00ebrputhje me programin e p\u00ebrgjithsh\u00ebm t\u00eb realizimit dhe t\u00eb dokumentacionit t\u00eb projektit;<br \/>\ng) Shoq\u00ebria \u201cKRONOS KONSTRUKSION\u201d, sh.p.k., ka detyrimin q\u00eb:<br \/>\nt\u00eb paraqes\u00eb periodikisht (\u00e7do tre muaj), pran\u00eb Ministris\u00eb s\u00eb Infrastruktur\u00ebs dhe Energjis\u00eb dhe Agjencis\u00eb Komb\u00ebtare t\u00eb Burimeve Natyrore, informacion mbi ecurin\u00eb e nd\u00ebrtimit t\u00eb centralit fotovoltaik;<br \/>\nt\u00eb respektoj\u00eb kushtet e cituara n\u00eb lejet, licencat dhe autorizimet paraprake mjedisore, l\u00ebshuar nga institucionet p\u00ebrgjegj\u00ebse komb\u00ebtare;<\/p>\n<p>iii. t\u00eb dor\u00ebzoj\u00eb sigurimin e kontrat\u00ebs, n\u00eb mas\u00ebn jo m\u00eb pak se 5% t\u00eb vler\u00ebs s\u00eb investimit, p\u00ebrpara n\u00ebnshkrimit t\u00eb kontrat\u00ebs nd\u00ebrmjet shoq\u00ebris\u00eb \u201cKRONOS KONSTRUKSION\u201d, sh.p.k., dhe ministris\u00eb. N\u00eb k\u00ebt\u00eb kontrat\u00eb p\u00ebrcaktohen t\u00eb drejtat dhe detyrimet e pal\u00ebve p\u00ebr realizimin e k\u00ebtij projekti, penalitetet, n\u00eb rast mosrealizimi, si dhe \u00e7\u00ebshtje t\u00eb tjera q\u00eb lidhen me zbatimin e saj;<\/p>\n<p>t\u2019i jap\u00eb falas, n\u00eb form\u00eb royalty, ministris\u00eb p\u00ebrgjegj\u00ebse p\u00ebr energjin\u00eb sasin\u00eb e energjis\u00eb elektrike, n\u00eb mas\u00ebn 2 (dy) % t\u00eb sasis\u00eb vjetore t\u00eb prodhimit t\u00eb energjis\u00eb elektrike ose konvertimin e saj n\u00eb vler\u00eb monetare. N\u00eb rast konvertimi n\u00eb vler\u00eb monetare, shuma duhet t\u00eb derdhet t\u00ebr\u00ebsisht n\u00eb buxhetin e shtetit;<br \/>\nt\u00eb p\u00ebrmbush\u00eb k\u00ebrkes\u00ebn, sipas rastit, q\u00eb nj\u00eb pjes\u00eb e prodhimit t\u00eb burimit gjenerues t\u00eb energjis\u00eb t\u2019i shitet furnizuesit publik, sipas legjislacionit n\u00eb fuqi.<br \/>\nNgarkohen Ministria e Infrastruktur\u00ebs dhe Energjis\u00eb dhe shoq\u00ebria \u201cKRONOS KONSTRUKSION\u201d, sh.p.k., p\u00ebr zbatimin e k\u00ebtij vendimi.<\/p>\n<p>Ky vendim hyn n\u00eb fuqi menj\u00ebher\u00eb dhe botohet n\u00eb \u201cFletoren zyrtare\u201d.<\/p>\n<p>K R Y E M I N I S T R I<\/p>\n<p>EDI RAMA<\/p>\n<p><em>N\u00eb mb\u00ebshtetje t\u00eb nenit 100 t\u00eb Kushtetut\u00ebs dhe t\u00eb pik\u00ebs 1, t\u00eb nenit 49, t\u00eb ligjit nr.43\/2015, \u201cP\u00ebr sektorin e energjis\u00eb elektrike\u201d, t\u00eb ndryshuar, me propozimin e ministrit t\u00eb Infrastruktur\u00ebs dhe Energjis\u00eb, K\u00ebshilli i Ministrave<\/em><\/p>\n<p><em>V E N D O S I:<\/em><\/p>\n<p><em>1. Miratimin e nd\u00ebrtimit t\u00eb centralit gjenerues t\u00eb energjis\u00eb elektrike fotovoltaike dhe veprave ndihm\u00ebse, i cili nuk \u00ebsht\u00eb objekt koncesioni dhe nuk p\u00ebrfiton nga masat mb\u00ebshtet\u00ebse, n\u00eb nj\u00ebsin\u00eb administrative Mbreshtan, Bashkia Kolonj\u00eb, Qarku Kor\u00e7\u00eb, nga shoq\u00ebria \u201cTEKNO FIRE\u201d, sh.p.k., me elementet, si m\u00eb posht\u00eb vijon:<\/em><\/p>\n<p><em>a) Emri i aplikuesit: Shoq\u00ebria \u201cTEKNO FIRE\u201d, sh.p.k.;<\/em><\/p>\n<p><em>b) NIPT\/NUIS: L01307010S;<\/em><\/p>\n<p><em>c) Tipi i centralit: Fotovoltaik;<\/em><\/p>\n<p><em>\u00e7)\u00a0 Kapaciteti i instaluar: 102 M\u00cb;<\/em><\/p>\n<p><em>d)\u00a0 Afati i pritsh\u00ebm i v\u00ebnies n\u00eb pun\u00eb dhe pajisja me leje nd\u00ebrtimi: Koha p\u00ebr nd\u00ebrtimin, pajisjen me lejen e nd\u00ebrtimit dhe v\u00ebnien n\u00eb operim t\u00eb impiantit fotovoltaik do t\u00eb jet\u00eb brenda 36 (tridhjet\u00eb e gjasht\u00eb) muajve nga hyrja n\u00eb fuqi e k\u00ebtij vendimi;<\/em><\/p>\n<p><em>dh) Vendndodhja e burimit gjenerues t\u00eb energjis\u00eb: N\u00eb nj\u00ebsin\u00eb administrative Mbreshtan, Bashkia Kolonj\u00eb, Qarku Kor\u00e7\u00eb;<\/em><\/p>\n<p><em>e) Afati i operimit: 49 (dyzet e n\u00ebnt\u00eb) vjet nga hyrja n\u00eb fuqi e k\u00ebtij vendimi;<\/em><\/p>\n<p><em>\u00eb)\u00a0 Koordinatat e projektit sipas aneksit 1, q\u00eb i bashk\u00eblidhet k\u00ebtij vendimi;<\/em><\/p>\n<p><em>f) MEI dhe Agjencia Komb\u00ebtare e Burimeve Natyrore kan\u00eb t\u00eb drejt\u00eb t\u00eb ushtrojn\u00eb mbik\u00ebqyrje t\u00eb p\u00ebrgjithshme, me afate 3-mujore gjat\u00eb realizimit, v\u00ebnies n\u00eb pun\u00eb dhe operimit, me synim q\u00eb t\u00eb verifikojn\u00eb se ecuria e punimeve, cil\u00ebsia, konformiteti dhe operimi jan\u00eb n\u00eb p\u00ebrputhje me programin e p\u00ebrgjithsh\u00ebm t\u00eb realizimit dhe t\u00eb dokumentacionit t\u00eb projektit;<\/em><\/p>\n<p><em>g)\u00a0 Shoq\u00ebria \u201cTEKNO FIRE\u201d, sh.p.k., ka detyrimin q\u00eb:<\/em><\/p>\n<p><em>i. t\u00eb paraqes\u00eb periodikisht, \u00e7do tre muaj, pran\u00eb Ministris\u00eb s\u00eb Infrastruktur\u00ebs dhe Energjis\u00eb dhe Agjencis\u00eb Komb\u00ebtare t\u00eb Burimeve Natyrore informacion p\u00ebr ecurin\u00eb e nd\u00ebrtimit t\u00eb centralit fotovoltaik;<\/em><\/p>\n<p><em>ii. t\u00eb respektoj\u00eb kushtet e cituara n\u00eb lejet, licencat dhe autorizimet paraprake mjedisore, l\u00ebshuar nga institucionet p\u00ebrgjegj\u00ebse komb\u00ebtare;<\/em><\/p>\n<p><em>iii. t\u00eb dor\u00ebzoj\u00eb sigurimin e kontrat\u00ebs, n\u00eb mas\u00ebn jo m\u00eb pak se 5% t\u00eb vler\u00ebs s\u00eb investimit, p\u00ebrpara n\u00ebnshkrimit t\u00eb kontrat\u00ebs nd\u00ebrmjet shoq\u00ebris\u00eb \u201cTEKNO FIRE\u201d, sh.p.k., dhe ministris\u00eb. N\u00eb k\u00ebt\u00eb kontrat\u00eb p\u00ebrcaktohen t\u00eb drejtat dhe detyrimet e pal\u00ebve p\u00ebr realizimin e k\u00ebtij projekti, penalitetet, n\u00eb rast mosrealizimi, si dhe \u00e7\u00ebshtje t\u00eb tjera q\u00eb lidhen me zbatimin e saj;<\/em><\/p>\n<p><em>iv. t\u2019i jap\u00eb falas, n\u00eb form\u00eb royalty, ministris\u00eb p\u00ebrgjegj\u00ebse p\u00ebr energjin\u00eb sasin\u00eb e energjis\u00eb elektrike, n\u00eb mas\u00ebn 2 (dy) % t\u00eb sasis\u00eb vjetore t\u00eb prodhimit t\u00eb energjis\u00eb elektrike ose konvertimin e saj n\u00eb vler\u00eb monetare. N\u00eb rast konvertimi n\u00eb vler\u00eb monetare, shuma duhet t\u00eb derdhet t\u00ebr\u00ebsisht n\u00eb buxhetin e shtetit;<\/em><\/p>\n<p><em>v. t\u00eb p\u00ebrmbush\u00eb k\u00ebrkes\u00ebn, sipas rastit, q\u00eb nj\u00eb pjes\u00eb e prodhimit t\u00eb burimit gjenerues t\u00eb energjis\u00eb t\u2019i shitet furnizuesit publik, sipas legjislacionit n\u00eb fuqi.<\/em><\/p>\n<p><em>2. Ngarkohen Ministria e Infrastruktur\u00ebs dhe Energjis\u00eb dhe shoq\u00ebria \u201cTEKNO FIRE\u201d, sh.p.k., p\u00ebr zbatimin e k\u00ebtij vendimi.<\/em><\/p>\n<p><em>Ky vendim hyn n\u00eb fuqi menj\u00ebher\u00eb dhe botohet n\u00eb \u201cFletoren zyrtare\u201d.<\/em><\/p>\n<p><em>K R Y E M I N I S T R I <\/em><\/p>\n<p><em>EDI RAMA<\/em><\/p>\n<p><strong>gijotina.com\/<\/strong><\/p>\n<p>The post <a href=\"https:\/\/gijotina.com\/centrali\/\">Miratohen 2 parqe fotovoltaik\u00eb\/ Rama i jep me koncesion 49 vjet tok\u00ebn oligarkut Vasil Jovani<\/a> appeared first on <a href=\"https:\/\/gijotina.com\/\">GIJOTINA<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>N\u00eb mbledhje t\u00eb sotme, K\u00ebshilli i Ministrave miratoi nd\u00ebrtimin e 2 centraleve p\u00ebr gjenerimin e energjis\u00eb elektrike n\u00eb jug t\u00eb vendit, nj\u00eb n\u00eb Kolonje dhe tjetri n\u00eb Devoll. Leja e pare i jepet oligarkut Vasil Jovani, pronar i Kronos Konstruksion, ndersa tjetra i jepet pronarit te \u201cTekno Fire\u201d, Alban Cejku, te njohur edhe si \u201cLuma [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-78237","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts\/78237","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/comments?post=78237"}],"version-history":[{"count":0,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts\/78237\/revisions"}],"wp:attachment":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/media?parent=78237"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/categories?post=78237"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/tags?post=78237"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}