{"id":66031,"date":"2026-01-23T21:42:56","date_gmt":"2026-01-23T21:42:56","guid":{"rendered":"https:\/\/zennihost.com\/test\/2026\/01\/23\/premtimi-i-pambajtur-i-ballukut-per-autostraden-tirane-durres\/"},"modified":"2026-01-23T21:42:56","modified_gmt":"2026-01-23T21:42:56","slug":"premtimi-i-pambajtur-i-ballukut-per-autostraden-tirane-durres","status":"publish","type":"post","link":"https:\/\/zennihost.com\/test\/2026\/01\/23\/premtimi-i-pambajtur-i-ballukut-per-autostraden-tirane-durres\/","title":{"rendered":"Premtimi i pambajtur i Ballukut p\u00ebr autostrad\u00ebn Tiran\u00eb \u2013 Durr\u00ebs"},"content":{"rendered":"<p><span>Vjesht\u00ebn e shkuar, ministrja e Infrastruktur\u00ebs dhe Energjis\u00eb, Belinda Balluku, deklaroi se 6 kilometrat e para t\u00eb zgjerimit t\u00eb autostrad\u00ebs Tiran\u00eb\u2013Durr\u00ebs do t\u00eb hapeshin p\u00ebr qarkullim brenda muajit dhjetor 2025. Segmenti nga Casa Italia deri n\u00eb mbikalimin e Kasharit, sipas saj, do t\u00eb kthehej n\u00eb nj\u00eb autostrad\u00eb tip A, me 32.5 metra gjer\u00ebsi, tre korsi n\u00eb secil\u00ebn an\u00eb dhe nj\u00eb korsi emergjence.<\/span><\/p>\n<p><span>\u201cEcuria e projektit \u00ebsht\u00eb shum\u00eb e mir\u00eb. Pra, faza e par\u00eb \u00ebsht\u00eb 65% ecuria dhe n\u00eb faz\u00ebn e dyt\u00eb 85%. Dometh\u00ebn\u00eb ne shpresojm\u00eb q\u00eb p\u00ebr festat e fundvitit ta kemi dor\u00ebzuar\u201d, deklaroi Balluku.<\/span><\/p>\n<p><span>Rruga q\u00eb lidh Tiran\u00ebn me Durr\u00ebsin \u00ebsht\u00eb 38 km e gjat\u00eb. Punimet p\u00ebr zgjerimin e saj nis\u00ebn n\u00eb shtator t\u00eb 2024-\u00ebs. Sipas kontrat\u00ebs, zgjerimi i rrug\u00ebs Tiran\u00eb-Durr\u00ebs n\u00eb 6 kilometrat e par\u00eb p\u00ebrfundon k\u00ebt\u00eb shtator.<\/span><\/p>\n<p><span>Por q\u00eb n\u00eb krye t\u00eb her\u00ebs, ministrja p\u00ebrgjegj\u00ebse pretendoi p\u00ebrfundim p\u00ebrpara afatit zyrtar.<\/span><\/p>\n<p><strong><span>Fakt<\/span><\/strong><\/p>\n<p><span>Koha d\u00ebshmoi se puna n\u00eb terren shkon p\u00ebrtej pritshm\u00ebrive optimiste t\u00eb qeveris\u00eb. 6 kilometrat e para t\u00eb rrug\u00ebs q\u00eb lidh kryeqytetin me Durr\u00ebsin nuk mbaruan n\u00eb fund t\u00eb vitit. Dhe si p\u00ebr ironi t\u00eb fatit, k\u00ebt\u00eb fillim vit, 16% i rrug\u00ebs q\u00eb duhet t\u00eb ishte hapur p\u00ebr qarkullim u b\u00eb i pakaluesh\u00ebm.<\/span><\/p>\n\n<p><span>Rruga Tiran\u00eb-Durr\u00ebs u p\u00ebrmbyt m\u00eb 6 janar nga reshjet e dendura t\u00eb shiut dhe autoritetet devijuan mjetet n\u00eb drejtime t\u00eb tjera.<\/span><\/p>\n\n<p><span>Fotot tregojn\u00eb gjendjen e zgjerimit t\u00eb autostrad\u00ebs Tiran\u00eb\u2013Durr\u00ebs gjat\u00eb dit\u00ebs s\u00eb verifikimit nga Faktoje, m\u00eb 15 janar. N\u00eb pamje dallohet se nj\u00eb pjes\u00eb e segmentit \u00ebsht\u00eb ende n\u00eb punime, me mjete nd\u00ebrtimi aktive dhe zona t\u00eb pap\u00ebrfunduara, nd\u00ebrsa qarkullimi i automjeteve zhvillohet pjes\u00ebrisht.<\/span><\/p>\n\n<p><span>Sipas Autoritetit Rrugor Shqiptar (ARRSH), hapja e plot\u00eb e 6 km t\u00eb para t\u00eb rrug\u00ebs u b\u00eb e pamundur p\u00ebr shkak se segmenti i ur\u00ebs pran\u00eb \u201cKull\u00ebs Eiffel\u201d mbeti i pap\u00ebrfunduar.<\/span><\/p>\n\n<p><span>\u201cAfati i p\u00ebrfundimit t\u00eb kontrat\u00ebs \u201cZgjerimi i superstrad\u00ebs Tiran\u00eb \u2013 Durr\u00ebs (Faza I)\u201d \u00ebsht\u00eb 24.05.2026, nd\u00ebrsa p\u00ebr Faz\u00ebn II \u00ebsht\u00eb 15 shtator 2026.\u201d \u2013 sqaron p\u00ebr Faktoje ARRSH.<\/span><\/p>\n<p><span>Edhe faza III, q\u00eb p\u00ebrfshin mbikalimin e Kasharit dhe Laknasit, nisi m\u00eb 9 tetor 2025 dhe ka afat p\u00ebrfundimi 18 muaj.<\/span><\/p>\n<p><span>Por afatet rrezikojn\u00eb t\u00eb shkelen p\u00ebr shkak t\u00eb shpron\u00ebsimeve.<\/span><\/p>\n<p><span>\u201cFaktor\u00eb q\u00eb mund t\u00eb ndikojn\u00eb \u00ebsht\u00eb procesi i shpron\u00ebsimeve q\u00eb akoma nuk \u00ebsht\u00eb p\u00ebrmbyllur.\u201d- thot\u00eb ARRSH p\u00ebr Faktoje.<\/span><\/p>\n<p><strong><span>P\u00ebrfundim<\/span><\/strong><\/p>\n<p><span>Zgjerimi i autostrad\u00ebs Tiran\u00eb\u2013Durr\u00ebs \u00ebsht\u00eb nj\u00eb nga projektet m\u00eb t\u00eb r\u00ebnd\u00ebsishme infrastrukturore n\u00eb vend, me kosto 218 mln euro, por deri m\u00eb tani ka prodhuar m\u00eb shum\u00eb premtime t\u00eb parealizuara sesa kilometra t\u00eb dor\u00ebzuar. Deklaratat p\u00ebr hapjen e 6 km t\u00eb para n\u00eb dhjetor 2025 nuk u realizuan, nd\u00ebrsa afatet kontraktuale tregojn\u00eb se punimet mbyllen majin e k\u00ebtij viti.<\/span><\/p>\n<p><span>Nisur nga verifikimet e kryera dhe informacionet e mbledhura, deklarat\u00ebn e ministres Belinda Balluku se 6 km e para t\u00eb rrug\u00ebs Tiran\u00eb-Durr\u00ebs do t\u00eb hapen p\u00ebr qarkullim n\u00eb fund t\u00eb dhjetorit\u2019 e kategorizojm\u00eb t\u00eb pav\u00ebrtet\u00eb. \/<a href=\"https:\/\/faktoje.al\/zgjerimi-i-vonuar-i-autostrades-tirane-durres\/\">Faktoje.al<\/a><\/span><\/p>\n<p>The post <a href=\"https:\/\/lapsi.al\/2026\/01\/23\/premtimi-i-pambajtur-i-ballukut-per-autostraden-tirane-durres\/\">Premtimi i pambajtur i Ballukut p\u00ebr autostrad\u00ebn Tiran\u00eb \u2013 Durr\u00ebs<\/a> appeared first on <a href=\"https:\/\/lapsi.al\/\">Lapsi.al<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Vjesht\u00ebn e shkuar, ministrja e Infrastruktur\u00ebs dhe Energjis\u00eb, Belinda Balluku, deklaroi se 6 kilometrat e para t\u00eb zgjerimit t\u00eb autostrad\u00ebs Tiran\u00eb\u2013Durr\u00ebs do t\u00eb hapeshin p\u00ebr qarkullim brenda muajit dhjetor 2025. Segmenti nga Casa Italia deri n\u00eb mbikalimin e Kasharit, sipas saj, do t\u00eb kthehej n\u00eb nj\u00eb autostrad\u00eb tip A, me 32.5 metra gjer\u00ebsi, tre korsi [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":66032,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-66031","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts\/66031","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/comments?post=66031"}],"version-history":[{"count":0,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts\/66031\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/media\/66032"}],"wp:attachment":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/media?parent=66031"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/categories?post=66031"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/tags?post=66031"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}