{"id":59098,"date":"2025-12-19T18:13:10","date_gmt":"2025-12-19T18:13:10","guid":{"rendered":"https:\/\/zennihost.com\/test\/2025\/12\/19\/qeveria-miraton-vendimin-park-fotovoltaik-ne-finiq\/"},"modified":"2025-12-19T18:13:10","modified_gmt":"2025-12-19T18:13:10","slug":"qeveria-miraton-vendimin-park-fotovoltaik-ne-finiq","status":"publish","type":"post","link":"https:\/\/zennihost.com\/test\/2025\/12\/19\/qeveria-miraton-vendimin-park-fotovoltaik-ne-finiq\/","title":{"rendered":"Qeveria miraton vendimin, park fotovoltaik n\u00eb Finiq"},"content":{"rendered":"<p>K\u00ebshilli i Ministrave ka miratuar nd\u00ebrtimin e nj\u00eb centralit gjenerues t\u00eb energjis\u00eb elektrike fotovoltaike dhe veprave ndihm\u00ebse, n\u00eb nj\u00ebsin\u00eb administrative Mesopotam, Bistric\u00eb, Bashkia Finiq, Qarku Vlor\u00eb. Koha p\u00ebr nd\u00ebrtimin, pajisjen me lejen e nd\u00ebrtimit dhe v\u00ebnien n\u00eb operim t\u00eb impiantit fotovoltaik do t\u00eb jet\u00eb brenda 36 muajve nga hyrja n\u00eb fuqi e k\u00ebtij vendimi.<\/p>\n<p>Nd\u00ebrsa afati i operimit \u00ebsht\u00eb 49 vjet nga hyrja n\u00eb fuqi e vendimit. Ministria e Infrastruktur\u00ebs dhe Energjis\u00eb dhe Agjencia Komb\u00ebtare e Burimeve Natyrore kan\u00eb t\u00eb drejt\u00eb t\u00eb ushtrojn\u00eb mbik\u00ebqyrje t\u00eb p\u00ebrgjithshme me afate 3-mujore gjat\u00eb realizimit, v\u00ebnies n\u00eb pun\u00eb dhe operimit.<\/p>\n<p>Kjo me synim q\u00eb t\u00eb verifikojn\u00eb se ecuria e punimeve, cil\u00ebsia, konformiteti dhe operimi jan\u00eb n\u00eb p\u00ebrputhje me programin e p\u00ebrgjithsh\u00ebm t\u00eb realizimit e t\u00eb dokumentacionit t\u00eb projektit.<\/p>\n<p>Vendimi i plot\u00eb:<\/p>\n<p>MIRATIMIN E ND\u00cbRTIMIT T\u00cb CENTRALIT GJENERUES T\u00cb ENERGJIS\u00cb ELEKTRIKE FOTOVOLTAIKE DHE VEPRAVE NDIHM\u00cbSE, I CILI NUK \u00cbSHT\u00cb OBJEKT KONCESIONI, N\u00cb NJ\u00cbSIN\u00cb ADMINISTATIVE MESOPOTAM, BISTRIC\u00cb, BASHKIA FINIQ, QARKU VLOR\u00cb, NGA SHOQ\u00cbRIA \u201cGREENSOL\u201d, SH.P.K.<\/p>\n<p>N\u00eb mb\u00ebshtetje t\u00eb nenit 100 t\u00eb Kushtetut\u00ebs dhe t\u00eb pik\u00ebs 1, t\u00eb nenit 49, t\u00eb ligjit nr.43\/2015, \u201cP\u00ebr sektorin e energjis\u00eb elektrike\u201d, t\u00eb ndryshuar, me propozimin e Z\u00ebvend\u00ebskryeministrit dhe minist\u00ebr i Infrastruktur\u00ebs dhe Energjis\u00eb, K\u00ebshilli i Ministrave V E N D O S I:<\/p>\n<p>1. Miratimin e nd\u00ebrtimit t\u00eb centralit gjenerues t\u00eb energjis\u00eb elektrike fotovoltaike dhe veprave ndihm\u00ebse, i cili nuk \u00ebsht\u00eb objekt koncesioni dhe nuk p\u00ebrfiton nga masat mb\u00ebshtet\u00ebse, n\u00eb nj\u00ebsin\u00eb administrative Mesopotam, Bistric\u00eb, Bashkia Finiq, Qarku Vlor\u00eb, nga shoq\u00ebria \u201cGREENSOL\u201d, sh.p.k., me elementet, si m\u00eb posht\u00eb vijon:<\/p>\n<p>a) Emri i aplikuesit: Shoq\u00ebria \u201cGREENSOL\u201d, sh.p.k.;<\/p>\n<p>b) NIPT\/NUIS: M22206011A;<\/p>\n<p>c) Tipi i centralit: Fotovoltaik;<\/p>\n<p>\u00e7) Kapaciteti i instaluar: 49.96 M\u00eb;<\/p>\n<p>d) Afati i pritsh\u00ebm i v\u00ebnies n\u00eb pun\u00eb dhe pajisja me leje nd\u00ebrtimi: Koha p\u00ebr nd\u00ebrtimin, pajisjen me lejen e nd\u00ebrtimit dhe v\u00ebnien n\u00eb operim t\u00eb impiantit fotovoltaik do t\u00eb jet\u00eb brenda 36 (tridhjet\u00eb e gjasht\u00eb) muajve nga hyrja n\u00eb fuqi e k\u00ebtij vendimi;<\/p>\n<p>dh) Vendndodhja e burimit gjenerues t\u00eb energjis\u00eb: N\u00eb nj\u00ebsin\u00eb administrative Mesopotam, Bistric\u00eb, Bashkia Finiq, Qarku Vlor\u00eb;<\/p>\n<p>e) Afati i operimit: 49 (dyzet e n\u00ebnt\u00eb) vjet nga hyrja n\u00eb fuqi e k\u00ebtij vendimi;<\/p>\n<p>\u00eb) Koordinatat e tok\u00ebs dhe planvendosja, sipas aneksit 1 q\u00eb i bashk\u00eblidhet k\u00ebtij vendimi;<\/p>\n<p>f) Ministria e Infrastruktur\u00ebs dhe Energjis\u00eb dhe Agjencia Komb\u00ebtare e Burimeve Natyrore kan\u00eb t\u00eb drejt\u00eb t\u00eb ushtrojn\u00eb mbik\u00ebqyrje t\u00eb p\u00ebrgjithshme me afate 3-mujore gjat\u00eb realizimit, v\u00ebnies n\u00eb pun\u00eb dhe operimit, me synim q\u00eb t\u00eb verifikojn\u00eb se ecuria e punimeve, cil\u00ebsia, konformiteti dhe operimi jan\u00eb n\u00eb p\u00ebrputhje me programin e p\u00ebrgjithsh\u00ebm t\u00eb realizimit e t\u00eb dokumentacionit t\u00eb projektit;<\/p>\n<p>g) Shoq\u00ebria \u201cGREENSOL\u201d, sh.p.k., ka detyrimin q\u00eb:<\/p>\n<p>i. t\u00eb paraqes\u00eb periodikisht (\u00e7do tre muaj) pran\u00eb Ministris\u00eb s\u00eb Infrastruktur\u00ebs dhe Energjis\u00eb dhe Agjencis\u00eb Komb\u00ebtare t\u00eb Burimeve Natyrore informacion p\u00ebr ecurin\u00eb e nd\u00ebrtimit t\u00eb centralit fotovoltaik;<\/p>\n<p>ii. t\u00eb respektoj\u00eb kushtet e cituara n\u00eb lejet, licencat dhe autorizimet paraprake mjedisore, l\u00ebshuar nga institucionet p\u00ebrgjegj\u00ebse komb\u00ebtare;<\/p>\n<p>iii. t\u00eb dor\u00ebzoj\u00eb sigurimin e kontrat\u00ebs, n\u00eb mas\u00ebn jo m\u00eb pak se 5% t\u00eb vler\u00ebs s\u00eb investimit, p\u00ebrpara n\u00ebnshkrimit t\u00eb kontrat\u00ebs, nd\u00ebrmjet shoq\u00ebris\u00eb \u201cGREENSOL\u201d, sh.p.k., dhe ministris\u00eb. N\u00eb k\u00ebt\u00eb kontrat\u00eb p\u00ebrcaktohen t\u00eb drejtat dhe detyrimet e pal\u00ebve p\u00ebr realizimin e k\u00ebtij projekti, penalitetet, n\u00eb rast mosrealizimi, si dhe \u00e7\u00ebshtje t\u00eb tjera, q\u00eb lidhen me zbatimin e saj;<\/p>\n<p>iv. t\u2019i jap\u00eb falas, n\u00eb form\u00eb royalty, ministris\u00eb p\u00ebrgjegj\u00ebse p\u00ebr energjin\u00eb sasin\u00eb e energjis\u00eb elektrike, n\u00eb mas\u00ebn 2 (dy) % t\u00eb sasis\u00eb vjetore t\u00eb prodhimit t\u00eb energjis\u00eb elektrike ose konvertimin e saj n\u00eb vler\u00eb monetare. N\u00eb rast konvertimi n\u00eb vler\u00eb monetare, shuma duhet t\u00eb derdhet t\u00ebr\u00ebsisht n\u00eb buxhetin e shtetit;<\/p>\n<p>v. t\u00eb p\u00ebrmbush\u00eb k\u00ebrkes\u00ebn, sipas rastit, q\u00eb nj\u00eb pjes\u00eb e prodhimit t\u00eb burimit gjenerues t\u00eb energjis\u00eb t\u2019i shitet furnizuesit publik, sipas legjislacionit n\u00eb fuqi.<\/p>\n<p>2. Ngarkohen Ministria e Infrastruktur\u00ebs dhe Energjis\u00eb dhe shoq\u00ebria \u201cGREENSOL\u201d, sh.p.k., p\u00ebr zbatimin e k\u00ebtij vendimi. Ky vendim hyn n\u00eb fuqi menj\u00ebher\u00eb dhe botohet n\u00eb \u201cFletoren zyrtare<\/p>\n<p>The post <a href=\"https:\/\/lapsi.al\/2025\/12\/19\/qeveria-miraton-vendimin-park-fotovoltaik-ne-finiq\/\">Qeveria miraton vendimin, park fotovoltaik n\u00eb Finiq<\/a> appeared first on <a href=\"https:\/\/lapsi.al\/\">Lapsi.al<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>K\u00ebshilli i Ministrave ka miratuar nd\u00ebrtimin e nj\u00eb centralit gjenerues t\u00eb energjis\u00eb elektrike fotovoltaike dhe veprave ndihm\u00ebse, n\u00eb nj\u00ebsin\u00eb administrative Mesopotam, Bistric\u00eb, Bashkia Finiq, Qarku Vlor\u00eb. Koha p\u00ebr nd\u00ebrtimin, pajisjen me lejen e nd\u00ebrtimit dhe v\u00ebnien n\u00eb operim t\u00eb impiantit fotovoltaik do t\u00eb jet\u00eb brenda 36 muajve nga hyrja n\u00eb fuqi e k\u00ebtij vendimi. Nd\u00ebrsa [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-59098","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts\/59098","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/comments?post=59098"}],"version-history":[{"count":0,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts\/59098\/revisions"}],"wp:attachment":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/media?parent=59098"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/categories?post=59098"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/tags?post=59098"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}