{"id":42710,"date":"2025-09-25T17:48:19","date_gmt":"2025-09-25T17:48:19","guid":{"rendered":"https:\/\/zennihost.com\/test\/2025\/09\/25\/koncesioni-49-vjet-rama-i-jep-park-fotovoltaik-ne-erseke-pronarit-te-kulles-prapa-hotel-dajtit\/"},"modified":"2025-09-25T17:48:19","modified_gmt":"2025-09-25T17:48:19","slug":"koncesioni-49-vjet-rama-i-jep-park-fotovoltaik-ne-erseke-pronarit-te-kulles-prapa-hotel-dajtit","status":"publish","type":"post","link":"https:\/\/zennihost.com\/test\/2025\/09\/25\/koncesioni-49-vjet-rama-i-jep-park-fotovoltaik-ne-erseke-pronarit-te-kulles-prapa-hotel-dajtit\/","title":{"rendered":"Koncesioni 49 vjet\/ Rama i jep park fotovoltaik n\u00eb Ersek\u00eb pronarit t\u00eb kull\u00ebs prapa hotel Dajtit"},"content":{"rendered":"<p>N\u00eb mbledhjen e dit\u00ebs s\u00eb sotme qeveria miratoi nd\u00ebrtimin e nj\u00eb centrali fotovoltaik 30 MW\u00a0n\u00eb Ersek\u00eb.<\/p>\n<p>Investimi pritet t\u00eb realizohet brenda 36 muajve dhe centrali do t\u00eb ket\u00eb nj\u00eb afat operimi 49-vje\u00e7ar.<\/p>\n<p>Shoq\u00ebria \u201cMET INVEST\u201d sh.p.k., ka detyrimin t\u00eb raportoj\u00eb \u00e7do tre muaj mbi ecurin\u00eb e punimeve, t\u00eb respektoj\u00eb kushtet mjedisore dhe t\u00eb dor\u00ebzoj\u00eb sigurimin e kontrat\u00ebs n\u00eb mas\u00ebn 5% t\u00eb investimit. Kompania \u00ebsht\u00eb pron\u00eb e\u00a0 Hauard Malos, q\u00eb \u00ebsht\u00eb gjithashtu pronar i Met Building, prapa hotel Dajtit. K\u00ebt\u00eb projekt e realizoi me kompanin\u00eb e Alban Pez\u00ebs dhe ish-kryeministrit Vilson Ahmeti, \u201cAlbanian Investment Construction\u201d.<\/p>\n<p>Projekti arkitektonik \u00ebsht\u00eb p\u00ebrgatitur dhe aplikuar nga studioja \u201cAtelier 4\u201d, p\u00ebrfaq\u00ebsuar nga Alban Efthimi, q\u00eb njihet p\u00ebr lidhjet e forta me kryeministrin Rama.<\/p>\n<p>Malo \u00ebsht\u00eb pronar i 7 kompanive (bashk\u00eb me v\u00ebllez\u00ebrit dhe motrat) p\u00ebrfshir\u00eb nj\u00eb kazino.<\/p>\n<p><em><strong>Vendimi i plot\u00eb i K\u00ebshillit t\u00eb Ministrave:<\/strong><\/em><\/p>\n<p><em>V E N D I M P\u00cbR MIRATIMIN E ND\u00cbRTIMIT T\u00cb CENTRALIT GJENERUES T\u00cb ENERGJIS\u00cb ELEKTRIKE FOTOVOLTAIKE DHE VEPRAVE NDIHM\u00cbSE, I CILI NUK \u00cbSHT\u00cb OBJEKT KONCESIONI, N\u00cb NJ\u00cbSIN\u00cb ADMINISTRATIVE QEND\u00cbR ERSEK\u00cb, BASHKIA KOLONJ\u00cb, QARKU KOR\u00c7\u00cb, NGA SHOQ\u00cbRIA \u201cMET INVEST\u201d, SH.P.K.<\/em><\/p>\n<p><em>N\u00eb mb\u00ebshtetje t\u00eb nenit 100 t\u00eb Kushtetut\u00ebs dhe t\u00eb pik\u00ebs 1, t\u00eb nenit 49, t\u00eb ligjit nr.43\/2015, \u201cP\u00ebr sektorin e energjis\u00eb elektrike\u201d, t\u00eb ndryshuar, me propozimin e Z\u00ebvend\u00ebskryeministrit dhe minist\u00ebr i Infrastruktur\u00ebs dhe Energjis\u00eb, K\u00ebshilli i Ministrave<\/em><\/p>\n<p><em>V E N D O S I:<\/em><\/p>\n<p><em>1. Miratimin e nd\u00ebrtimit t\u00eb centralit gjenerues t\u00eb energjis\u00eb elektrike fotovoltaike dhe veprave ndihm\u00ebse, i cili nuk \u00ebsht\u00eb objekt koncesioni dhe nuk p\u00ebrfiton nga masat mb\u00ebshtet\u00ebse, n\u00eb nj\u00ebsin\u00eb administrative Qend\u00ebr Ersek\u00eb, Bashkia Kolonj\u00eb, Qarku Kor\u00e7\u00eb, nga shoq\u00ebria \u201cMET INVEST\u201d, sh.p.k., me elementet, si m\u00eb posht\u00eb vijon:<\/em><\/p>\n<p><em>a) Emri i aplikuesit: Shoq\u00ebria \u201cMET INVEST\u201d, sh.p.k.;<\/em><\/p>\n<p><em>b) NIPT\/NUIS: L81310039M;<\/em><\/p>\n<p><em>c) Tipi i centralit: Fotovoltaik;<\/em><\/p>\n<p><em>\u00e7)\u00a0 Kapaciteti i instaluar: 30MW;<\/em><\/p>\n<p><em>d)\u00a0 Afati i pritsh\u00ebm i v\u00ebnies n\u00eb pun\u00eb dhe pajisja me leje nd\u00ebrtimi: Koha p\u00ebr nd\u00ebrtimin, pajisjen me lejen e nd\u00ebrtimit dhe v\u00ebnien n\u00eb operim t\u00eb impiantit fotovoltaik do t\u00eb jet\u00eb brenda 36 (tridhjet\u00eb e gjasht\u00eb) muajve nga hyrja n\u00eb fuqi e k\u00ebtij vendimi;<\/em><\/p>\n<p><em>dh) Vendndodhja e burimit gjenerues t\u00eb energjis\u00eb: N\u00eb nj\u00ebsin\u00eb administrative Qend\u00ebr Ersek\u00eb, Bashkia Kolonj\u00eb, Qarku Kor\u00e7\u00eb;<\/em><\/p>\n<p><em>e) Afati i operimit: 49 (dyzet e n\u00ebnt\u00eb) vjet nga hyrja n\u00eb fuqi e k\u00ebtij vendimi;<\/em><\/p>\n<p><em>\u00eb)\u00a0 Koordinatat e tok\u00ebs dhe planvendosja sipas aneksit 1, q\u00eb i bashk\u00eblidhet k\u00ebtij vendimi;<\/em><\/p>\n<p><em>f) Ministria e Infrastruktur\u00ebs dhe Energjis\u00eb dhe Agjencia Komb\u00ebtare e Burimeve Natyrore kan\u00eb t\u00eb drejt\u00eb t\u00eb ushtrojn\u00eb mbik\u00ebqyrje t\u00eb p\u00ebrgjithshme me afate 3-mujore gjat\u00eb realizimit, v\u00ebnies n\u00eb pun\u00eb dhe operimit, me synim q\u00eb t\u00eb verifikojn\u00eb se ecuria e punimeve, cil\u00ebsia, konformiteti dhe operimi jan\u00eb n\u00eb p\u00ebrputhje me programin e p\u00ebrgjithsh\u00ebm t\u00eb realizimit dhe dokumentacionin e projektit;<\/em><\/p>\n<p><em>g)\u00a0 Shoq\u00ebria \u201cMET INVEST\u201d, sh.p.k., ka detyrimin q\u00eb:<\/em><\/p>\n<p><em>i. t\u00eb paraqes\u00eb periodikisht (\u00e7do tre muaj) pran\u00eb Ministris\u00eb s\u00eb Infrastruktur\u00ebs dhe Energjis\u00eb dhe Agjencis\u00eb Komb\u00ebtare t\u00eb Burimeve Natyrore informacion p\u00ebr ecurin\u00eb e nd\u00ebrtimit t\u00eb centralit fotovoltaik;<\/em><\/p>\n<p><em>ii. t\u00eb respektoj\u00eb kushtet e cituara n\u00eb lejet, licencat dhe autorizimet paraprake mjedisore, l\u00ebshuar nga institucionet p\u00ebrgjegj\u00ebse komb\u00ebtare;<\/em><\/p>\n<p><em>iii. t\u00eb dor\u00ebzoj\u00eb sigurimin e kontrat\u00ebs, n\u00eb mas\u00ebn jo m\u00eb pak se 5% t\u00eb vler\u00ebs s\u00eb investimit, p\u00ebrpara n\u00ebnshkrimit t\u00eb kontrat\u00ebs nd\u00ebrmjet shoq\u00ebris\u00eb \u201cMET INVEST\u201d, sh.p.k., dhe ministris\u00eb. N\u00eb k\u00ebt\u00eb kontrat\u00eb p\u00ebrcaktohen t\u00eb drejtat dhe detyrimet e pal\u00ebve p\u00ebr realizimin e k\u00ebtij projekti, penalitetet, n\u00eb rast mosrealizimi, si dhe \u00e7\u00ebshtje t\u00eb tjera q\u00eb lidhen me zbatimin e saj;<\/em><\/p>\n<p><em>iv. t\u2019i jap\u00eb falas, n\u00eb form\u00eb royalty, ministris\u00eb p\u00ebrgjegj\u00ebse p\u00ebr energjin\u00eb sasin\u00eb e energjis\u00eb elektrike, n\u00eb mas\u00ebn 2 (dy) % t\u00eb sasis\u00eb vjetore t\u00eb prodhimit t\u00eb energjis\u00eb elektrike ose konvertimin e saj n\u00eb vler\u00eb monetare. N\u00eb rast konvertimi n\u00eb vler\u00eb monetare, shuma duhet t\u00eb derdhet t\u00ebr\u00ebsisht n\u00eb buxhetin e shtetit;<\/em><\/p>\n<p><em>v. t\u00eb p\u00ebrmbush\u00eb k\u00ebrkes\u00ebn, sipas rastit, q\u00eb nj\u00eb pjes\u00eb e prodhimit t\u00eb burimit gjenerues t\u00eb energjis\u00eb t\u2019i shitet furnizuesit publik, sipas legjislacionit n\u00eb fuqi.<\/em><\/p>\n<p><em>2. Ngarkohen Ministria e Infrastruktur\u00ebs dhe Energjis\u00eb dhe shoq\u00ebria \u201cMET INVEST\u201d, sh.p.k., p\u00ebr zbatimin e k\u00ebtij vendimi.<\/em><\/p>\n<p><em>Ky vendim hyn n\u00eb fuqi menj\u00ebher\u00eb dhe botohet n\u00eb \u201cFletoren zyrtare\u201d.<\/em><\/p>\n<p><em>K R Y E M I N I S T R I<\/em><\/p>\n<p><em>EDI RAMA<\/em><\/p>\n<p><strong>gijotina.com\/<\/strong><\/p>\n<p>The post <a href=\"https:\/\/gijotina.com\/koncesioni-49-vjet-rama-i-jep-park-fotovoltaik-ne-erseke-pronarit-te-kulles-prapa-hotel-dajtit\/\">Koncesioni 49 vjet\/ Rama i jep park fotovoltaik n\u00eb Ersek\u00eb pronarit t\u00eb kull\u00ebs prapa hotel Dajtit<\/a> appeared first on <a href=\"https:\/\/gijotina.com\/\">GIJOTINA<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>N\u00eb mbledhjen e dit\u00ebs s\u00eb sotme qeveria miratoi nd\u00ebrtimin e nj\u00eb centrali fotovoltaik 30 MW\u00a0n\u00eb Ersek\u00eb. Investimi pritet t\u00eb realizohet brenda 36 muajve dhe centrali do t\u00eb ket\u00eb nj\u00eb afat operimi 49-vje\u00e7ar. Shoq\u00ebria \u201cMET INVEST\u201d sh.p.k., ka detyrimin t\u00eb raportoj\u00eb \u00e7do tre muaj mbi ecurin\u00eb e punimeve, t\u00eb respektoj\u00eb kushtet mjedisore dhe t\u00eb dor\u00ebzoj\u00eb sigurimin [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-42710","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts\/42710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/comments?post=42710"}],"version-history":[{"count":0,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts\/42710\/revisions"}],"wp:attachment":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/media?parent=42710"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/categories?post=42710"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/tags?post=42710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}