{"id":38726,"date":"2025-09-04T07:48:22","date_gmt":"2025-09-04T07:48:22","guid":{"rendered":"https:\/\/zennihost.com\/test\/2025\/09\/04\/93-mln-e-per-gazin-natyror-dy-projekte-kyce-ne-shqiperi-marrin-driten-jeshile\/"},"modified":"2025-09-04T07:48:22","modified_gmt":"2025-09-04T07:48:22","slug":"93-mln-e-per-gazin-natyror-dy-projekte-kyce-ne-shqiperi-marrin-driten-jeshile","status":"publish","type":"post","link":"https:\/\/zennihost.com\/test\/2025\/09\/04\/93-mln-e-per-gazin-natyror-dy-projekte-kyce-ne-shqiperi-marrin-driten-jeshile\/","title":{"rendered":"93 mln \u20ac p\u00ebr gazin natyror, dy projekte ky\u00e7e n\u00eb Shqip\u00ebri marrin drit\u00ebn jeshile"},"content":{"rendered":"<p>Korniza e Investimeve n\u00eb Ballkanin Per\u00ebndimor (WBIF) ka kualifikuar dy projekte n\u00eb sektorin e gazit p\u00ebr financim nga donator\u00ebt dhe bankat nd\u00ebrkomb\u00ebtare t\u00eb Zhvillimit.<\/p>\n<p>B\u00ebhet fjal\u00eb p\u00ebr projektet \u201cDepozitimi n\u00ebntok\u00ebsor i gazit natyror n\u00eb Dumre\u201d me kosto 75.3 milion\u00eb euro dhe Linja e Transmetimit t\u00eb Gazit Fier-Vlor\u00eb 17.4 milion\u00eb euro.<\/p>\n<p>Projektet synohet t\u00eb zhvillohen p\u00ebrgjat\u00eb 4 viteve n\u00eb vijim me synimin p\u00ebr tu p\u00ebrmbyllur rreth vitit 2030 deh aktualisht jan\u00eb n\u00eb faz\u00ebn e p\u00ebrgatitjes.<\/p>\n<p>Shqip\u00ebria, Kosova dhe Mali i Zi jan\u00eb t\u00eb vetmet vende n\u00eb Evrop\u00eb q\u00eb nuk jan\u00eb t\u00eb lidhura me sistemet nd\u00ebrshtet\u00ebrore t\u00eb transmetimit t\u00eb gazit. Sektori i gazit n\u00eb Shqip\u00ebri ka qen\u00eb n\u00eb r\u00ebnie t\u00eb vazhdueshme. Prodhimi vendas i gazit nga 1 miliard\u00eb metra kub n\u00eb vitin 1982 n\u00eb vitet e fundit \u00ebsht\u00eb vet\u00ebm 0.01 miliard\u00eb metra kub. Shumica e tubacioneve ekzistuese t\u00eb gazit jan\u00eb t\u00eb vjetra n\u00eb gjendje t\u00eb keqe, ndaj lind nevoja p\u00ebr nj\u00eb sistem transmetimi dhe shp\u00ebrndarjeje gazi krejt\u00ebsisht i ri. Me p\u00ebrjashtim t\u00eb tubacionit t\u00eb rinovuar nga fusha e gazit Delvin\u00eb n\u00eb rafinerin\u00eb n\u00eb Ballsh, infrastruktura e gazit \u00ebsht\u00eb jo funksionale dhe do t\u00eb k\u00ebrkonte rehabilitim p\u00ebrpara se t\u00eb vihej n\u00eb funksion.<\/p>\n<p>Sipas informacionit zyrtar t\u00eb Korniz\u00ebs s\u00eb Investimeve n\u00eb Ballkanin Per\u00ebndimor objektivi i depozitimi n\u00ebntok\u00ebsor i gazit natyror n\u00eb Dumre do t\u00eb kontribuoj\u00eb n\u00eb zhvillimin afatgjat\u00eb t\u00eb sistemit t\u00eb gazit t\u00eb Shqip\u00ebris\u00eb, duke p\u00ebrmir\u00ebsuar furnizimin me gaz p\u00ebr vendin, n\u00ebp\u00ebrmjet nd\u00ebrtimit dhe funksionimit t\u00eb magazinimit n\u00ebntok\u00ebsor.<\/p>\n<p>K\u00ebto investime do t\u00eb plot\u00ebsojn\u00eb furnizimin me gaz q\u00eb buron nga Lindja e Mesme dhe Rajoni Kaspik n\u00ebp\u00ebrmjet Gazsjell\u00ebsit Trans Adriatik (TAP). Sektori i energjis\u00eb elektrike n\u00eb Shqip\u00ebri do t\u00eb p\u00ebrfitonte nga shtimi i nj\u00eb kapacitetit gjenerimi jasht\u00eb orarit t\u00eb pikut dhe do t\u00eb plot\u00ebsonte prodhimin hidroenergjetik n\u00eb periudha me kushte t\u00eb pafavorshme hidrologjike.<\/p>\n<p>Depozita e gazit n\u00eb Dumre mund\u00ebson nd\u00ebrtimin dhe funksionin e HEC-ve me gaz. N\u00ebse kjo do t\u00eb arrihet n\u00eb afate duke filluar nga viti 2030, importet e energjis\u00eb elektrike nuk jan\u00eb m\u00eb t\u00eb nevojshme dhe Shqip\u00ebria do t\u00eb ket\u00eb kapacitet t\u00eb tep\u00ebrt p\u00ebr eksportimin e energjis\u00eb elektrike.<\/p>\n<p>Mir\u00ebpo \u00e7\u00ebshtja kryesore \u00ebsht\u00eb n\u00ebse do t\u00eb ket\u00eb investime t\u00eb mjaftueshme n\u00eb infrastruktur\u00eb p\u00ebr t\u00eb sjell\u00eb gazin n\u00eb treg dhe q\u00ebndrueshm\u00ebria ekonomike e investimeve t\u00eb tilla. Projekti i par\u00eb i transmetimit t\u00eb kualifikuar nga donator\u00ebt \u00ebsht\u00eb Fier -Vlor\u00eb me rreth 17.4 milion\u00eb euro.<\/p>\n<p>Gazi q\u00eb do t\u00eb kaloj\u00eb p\u00ebrmes TAP dhe m\u00eb pas nj\u00eb rrjeti shqiptar dhe do t\u00eb mbush\u00eb kapacitetin e magazinimit mund t\u00eb vij\u00eb nga pellgu i Kaspikut. Projekti p\u00ebrfshin konkretisht nd\u00ebrtimin e nj\u00eb tubacioni gazi natyror rreth 40 km, i cili do t\u00eb lidh\u00eb TEC-in e Vlor\u00ebs me TAP-in. P\u00ebrve\u00e7 k\u00ebsaj, TEC-i i Vlor\u00ebs do t\u00eb konvertohet p\u00ebr t\u00eb p\u00ebrdorur gaz natyror si l\u00ebnd\u00eb djeg\u00ebse p\u00ebr prodhimin e energjis\u00eb elektrike n\u00eb vend t\u00eb naft\u00ebs.\/Marr\u00eb nga Monitor<\/p>\n<p>The post <a href=\"https:\/\/lexo.al\/2025\/09\/93-mln-e-per-gazin-natyror-dy-projekte-kyce-ne-shqiperi-marrin-driten-jeshile\/\">93 mln \u20ac p\u00ebr gazin natyror, dy projekte ky\u00e7e n\u00eb Shqip\u00ebri marrin drit\u00ebn jeshile<\/a> appeared first on <a href=\"https:\/\/lexo.al\/\">www.lexo.al<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Korniza e Investimeve n\u00eb Ballkanin Per\u00ebndimor (WBIF) ka kualifikuar dy projekte n\u00eb sektorin e gazit p\u00ebr financim nga donator\u00ebt dhe bankat nd\u00ebrkomb\u00ebtare t\u00eb Zhvillimit. B\u00ebhet fjal\u00eb p\u00ebr projektet \u201cDepozitimi n\u00ebntok\u00ebsor i gazit natyror n\u00eb Dumre\u201d me kosto 75.3 milion\u00eb euro dhe Linja e Transmetimit t\u00eb Gazit Fier-Vlor\u00eb 17.4 milion\u00eb euro. Projektet synohet t\u00eb zhvillohen p\u00ebrgjat\u00eb [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-38726","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts\/38726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/comments?post=38726"}],"version-history":[{"count":0,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/posts\/38726\/revisions"}],"wp:attachment":[{"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/media?parent=38726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/categories?post=38726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zennihost.com\/test\/wp-json\/wp\/v2\/tags?post=38726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}